建築工程中綜合單價名詞解釋(房屋建設工程施工總承包合同)

2023-04-21 10:12:18 2

建築工程中綜合單價名詞解釋?房屋建設工程施工總承包合同(固定單價)(中英文對照),今天小編就來聊一聊關於建築工程中綜合單價名詞解釋?接下來我們就一起去研究一下吧!

建築工程中綜合單價名詞解釋

房屋建設工程施工總承包合同(固定單價)(中英文對照)

GENERAL Contract FOR HOUSING CONSTRUCTION WORKS

(fixed unit price)



目錄 TABLE OF CONTENTS

合同協議書

Contract agreement



合同專用條件

Particular terms of contract

合同通用條件

General Conditions of Contract

一 詞語定義及合同文件

1. Definition of terms and contract documents



二 雙方一般權利和義務

2. General rights and obligations of the parties

三 施工組織設計和工期

3. Construction organization design and schedule



四 質量與檢驗

4. quality and inspection

五 安全施工

5. Safe construction

六 合同價款與支付

6. Contract price and payment

七 材料設備供應

7. Supply of materials and equipment

八 工程變更

8. Work variation

九 竣工驗收與結算

9. Acceptance of Completion and Settlement

十 違約、索賠和爭議

10. Default, claims and disputes



十一 其他 11. Miscellaneous



部分章節示例如下:

六 合同價款與支付 VI. Contract price and payment

23. 合同價款及調整 23. Contract price and adjustment

23.1 招標工程的合同價款由發包人承包人依據中標通知書中的中標價格在協議書內約定。非招標工程的合同價款由發包人承包人依據工程預算書在協議書內約定。

23.1 The contract price for bidding works shall be agreed between the Employer and the Contractor in the agreement on the basis of the winning price in the Notice of Award. The contract price for non-bidding works shall be agreed between the Employer and the Contractor in the Letter of Agreement on the basis of the project budget.



23.2 合同價款在協議書內約定後,任何一方不得擅自改變。下列三種確定合同價款的方式,雙方可在專用條款內約定採用其中一種:

23.2 The contract price specified in the agreement shall not be altered by either party. The parties may, in the Particular Terms of Contract, agree to use one of the following three ways of determining the contract price.



(1)固定價格合同。雙方在專用條款內約定合同價款包含的風險範圍和風險費用的計算方法,在約定的風險範圍內合同價款不再調整。風險範圍以外的合同價款調整方法。應當在專用條款內約定。

(1) Fixed price contracts. The parties agree on the scope of risk and the method of calculating the risk cost in the Particular Terms of Contract, and the contract price within the agreed scope of risk will not be adjusted. The adjustment method of the contract price beyond the scope of risk shall be specified in the Particular Terms of Contract.



(2)可調價格合同。合同價款可根據雙方的約定而調整,雙方在專用條款內約定合同價款調整方法。

(2) Adjustable price contracts. The contract price can be adjusted pursuant to the agreement of the parties, and the parties hereto shall, in the Particular Terms of Contract, agree on the method of adjustment of the contract price.



(3)成本加酬金合同。合同價款包括成本和酬金兩部分,雙方在專用條款內約定成本構成和酬金的計算方法。

(3) Cost-plus-gratuity contracts. The contract price includes two parts of cost and remuneration, and the parties hereto shall, in the Particular Terms of Contract, agree on the composition of the cost and the calculation of the remuneration.



23.3 可調價格合同中合同價款的調整因素包括:

23.3 The adjustment factors of the contract price in the adjustable price contract shall include:



(1)法律、行政法規和國家有關政策變化影響合同價款;

(1) The variations in laws, administrative regulations and relevant State’s policies affecting the contract price.



(2)工程造價管理部門公布的價格調整;

(2) Price adjustment announced by the project cost management authority;



(3)一周內非承包人原因停水、停電、停氣造成停工累計超過8小時;

(3) The suspension time is more than 8 hours caused by water shutdown, power failure and gas shutdown within one week with non-reason of the contractor;



(4)雙方約定的其他因素。

(4) Other factors as agreed upon by the parties hereto.



23.4 承包人應當在23.3款情況發生後14天內,將調整原因、金額以書面形式通知工程師,工程師確認調整金額後作為追加合同價款,與工程款同期支付。工程師收到承包人通知後14天內不予確認也不提出修改意見,視為已經同意該項調整。

23.4 The Contractor shall, within 14 days upon the occurrence of the circumstances in paragraph 23.3, notify the Engineer in writing of the reason for and the amount of the adjustment, and the amount of the adjustment confirmed by the Engineer shall be paid as an additional contract price at the same term as the payment for the Works. The failure of the Engineer to make acknowledgement or propose changes thereof shall be deemed as having agreed to the adjustment.



24. 工程預付款 24. Project advance payment

實行工程預付款的,雙方應當在專用條款內約定發包人向承包人預付工程款的時間和數額,開工後按約定的時間和比例逐次扣回。預付時間應不遲於約定的開工日期前7天。發包人不按約定預付,承包人在約定預付時間7天後向發包人發出要求預付的通知,發包人收到通知後仍不能按要求預付,承包人可在發出通知後7天停止施工,發包人應從約定應付之日起向承包人支付應付款的貸款利息,並承擔違約責任。

Where advance payment for the works is implemented, the parties shall agree in the Particular Terms of Contract on the time and amount of advance payment for the works to be made by the Employer to the Contractor, which shall be deducted in accordance with the agreed time and proportion after the commencement of the works. The prepayment shall be made no later than seven days prior to the agreed date of commencement of work, and where the Employer fails to do so, the Contractor shall, seven days after the agreed prepayment time, give notice to it requiring prepayment. Where the Employer still fails to make the required prepayment upon receipt of the notice, the Contractor may suspend the work seven days after the notice is given and claim the Employer for the interest on the loan payable from the date of the agreed payable and the liability of breach of contract.



25. 工程量的確認 25. Confirmation of the project quantity

25.1 承包人應按專用條款約定的時間,向工程師提交已完工程量的報告。工程師接到報告後7天內按設計圖紙核實已完工程量(以下稱計量),並在計量前24小時通知承包人,承包人為計量提供便利條件並派人參加。承包人收到通知後不參加計量,計量結果有效,作為工程價款支付的依據。

25.1 The Contractor shall submit to the Engineer a report of the work quantity performed at the time specified in the Particular Terms of Contract. The Engineer shall verify the quantity of work done in accordance with the design drawings within seven days upon receipt of the report (hereinafter referred to as metering) and shall, 24 hours prior to metering, notify the Contractor which shall facilitate the metering and send its personnel to participate in. Where the Contractor fails to participate in the measurement upon receiving the notice, the measurement is valid and serves as the basis for payment of the work price.



25.2 工程師收到承包人報告後7天內未進行計量,從第8天起,承包人報告中開列的工程量即視為被確認,作為工程價款支付的依據。工程師不按約定時間通知承包人,致使承包人未能參加計量,計量結果無效。

25.2 Where the measurement is not taken within seven days upon the Engineer's receipt of the Contractor's report, from the 8th day the quantities of work set out in the Contractor's report shall be deemed to be confirmed as the basis for payment of the work price. Where the Engineer fails to notify the Contractor at the agreed time, which result the Contractor fails to attend the measurement, the measurement shall be invalid.



25.3 對承包人超出設計圖紙範圍和因承包人原因造成返工的工程量,工程師不予計量。

25.3 The Engineer shall not measure the Contractor's work which is beyond the scope of the design drawings and the quantity of rework is due to the reason of the Contractor.



26. 工程款(進度款)支付

26. Payment of work payment (progress payment)



26.1 在確認計量結果後14天內,發包人應向承包人支付工程款(進度款)。按約定時間發包人應扣回的預付款,與工程款(進度款)同期結算。

26.1 The Contractor shall, within 14 days upon confirmation of the measurement results, pay the Contractor for the works (progress payment). The advance payment to be withheld by the Employer at the agreed time shall be settled at the same time as the payment for the works (progress payment).



26.2 本通用條款第23條確定調整的合同價款,第31條工程變更調整的合同價款及其他條款中約定的追加合同價款,應與工程款(進度款)同期調整支付。

26.2 The contract price adjusted as determined in article 23 of this General Conditions, the contract price adjusted for variations to the works in article 31 and the additional contract price specified in other articles shall be adjusted and paid at the same time as the payment for the works (progress payment).



26.3 發包人超過約定的支付時間不支付工程款(進度款),承包人可向發包人發出要求付款的通知,發包人收到承包人通知後仍不能按要求付款,可與承包人協商籤訂延期付款協議,經承包人同意後可延期支付。協議應明確延期支付的時間和從計量結果確認後第15天起應付款的貸款利息。

26.3 Provided that the Employer fails to make payment for the works (progress payment) beyond the agreed payment time, the Contractor may give notice to the Employer requesting payment, and if the Employer is still unable to make the required payment upon receipt of the Contractor's notice, may negotiate with the Contractor to enter into an agreement for deferred payment, which may be deferred with the consent of the Contractor. The agreement shall specify the time of deferred payment and the interest on the loan payable from the 15th day upon the confirmation of the measurement result.



26.4 發包人不按合同約定支付工程款(進度款),雙方又未達成延期付款協議,導致施工無法進行,承包人可停止施工,由發包人承擔違約責任。

26.4 Where the Employer fails to pay for the work (progress payment) as specified in the contract and the parties do not reach an agreement on deferred payment, which result in the construction unable to proceed, the Contractor may suspend the construction and the breach liability will be undertaken by the Employer.



七 材料設備供應 VII Supply of materials and equipment

27. 發包人供應材料設備

27. Supply of material and equipment by the Employer



27.1 實行發包人供應材料設備的,雙方應當約定發包人供應材料設備的一覽表,作為本合同附件(附件2)。一覽表包括發包人供應材料設備的品種、規格、型號、數量、單價、質量等級、提供時間和地點。

Where the supply of material and equipment by the Employer is agreed, the parties hereto shall agree on a schedule of materials and equipment to be supplied by the Employer as an annex hereto (Annex 2) which include the variety, specification, type, quantity, unit price, quality grade, time and place of supply of materials and equipment by the Employer.



27.2 發包人按一覽表約定的內容提供材料設備,並向承包人提供產品合格證明,對其質量負責。發包人在所供材料設備到貨前24小時,以書面形式通知承包人,由承包人派人與發包人共同清點。

27.2 The Employer shall supply the materials and equipment as specified in the schedule and shall provide the Contractor with proof of product conformity and be responsible for their quality. The Employer will notify the Contractor in writing 24 hours prior to the arrival of the materials and equipment supplied, and the Contractor will dispatch its personnel to check with the Contractor.



27.3 發包人供應的材料設備,承包人派人參加清點後由承包人妥善保管,發包人支付相應保管費用。因承包人原因發生丟失損壞,由承包人負責賠償。發包人未通知承包人清點,承包人不負責材料設備的保管,丟失損壞由發包人負責。

27.3 The materials and equipment supplied by the Employer shall be properly stored by the Contractor subsequent to its personnel’s participation of checking, and the corresponding storage costs will be the Employer’s account. Where the Employer is not notified by the contractor of the inventory, the contractor is not responsible for the storage of the material and equipment and is responsible for any loss or damage.





28. 承包人採購材料設備

28. Material and equipment procured by the Contractor



28.1 承包人負責採購材料設備的,應按照專用條款約定及設計和有關標準要求採購,並提供產品合格證明,對材料設備質量負責。承包人在材料設備到貨前24小時通知工程師清點。

28.1 Where the Contractor is responsible for the procurement of materials and equipment, it shall procure the same in accordance with the agreement of the Particular Terms of Contract and the requirements of the design and relevant standards, in addition to provide the proof of product conformity and be responsible for the quality thereof. The Contractor shall, 24 hours prior to the arrival of the material and equipment, notify the Engineer to take inventory.



28.2 承包人採購的材料設備與設計標準要求不符時,承包人應按工程師要求的時間運出施工場地,重新採購符合要求的產品,承擔由此發生的費用,由此延誤的工期不予順延。

28.2 Where the materials and equipment procured by the Contractor do not conform to the requirements of the design standards, the Contractor shall transport them out of the construction site at the time required by the Engineer and procure new products conforming to the requirements and bear the costs incurred therefrom, and the period of work delayed thereby shall not be extended.



28.3 承包人採購的材料設備在使用前,承包人應按工程師的要求進行檢驗或試驗,不合格的不得使用,檢驗或試驗費用由承包人承擔。

28.3 The Contractor shall, prior to using the materials and equipment purchased by the Contractor, conduct inspection or test according to the requirements of the Engineer. The unqualified ones shall not be used and the inspection or test cost shall be borne by the Contractor.



28.4 工程師發現承包人採購並使用不符合設計和標準要求的材料設備時,應要求承包人負責修復、拆除或重新採購,由承包人承擔發生的費用,由此延誤的工期不予順延。

28.4 Where the Engineer finds that the Contractor has procured and used materials and equipment which do not conform to the requirements of the design and standards, he shall require the Contractor responsible for repairing, removing or re-procuring them at the Contractor's expense, and no extension of time shall be granted for any delay so caused.









,
同类文章
葬禮的夢想

葬禮的夢想

夢見葬禮,我得到了這個夢想,五個要素的五個要素,水火只好,主要名字在外面,職業生涯良好,一切都應該對待他人治療誠意,由於小,吉利的冬天夢想,秋天的夢是不吉利的
找到手機是什麼意思?

找到手機是什麼意思?

找到手機是什麼意思?五次選舉的五個要素是兩名士兵的跡象。與他溝通很好。這是非常財富,它擅長運作,職業是仙人的標誌。單身男人有這個夢想,主要生活可以有人幫忙
我不怎麼想?

我不怎麼想?

我做了什麼意味著看到米飯烹飪?我得到了這個夢想,五線的主要土壤,但是Tu Ke水是錢的跡象,職業生涯更加真誠。他真誠地誠實。這是豐富的,這是夏瑞的巨星
夢想你的意思是什麼?

夢想你的意思是什麼?

你是什​​麼意思夢想的夢想?夢想,主要木材的五個要素,水的跡象,主營業務,主營業務,案子應該抓住魅力,不能疏忽,春天夢想的吉利夢想夏天的夢想不幸。詢問學者夢想
拯救夢想

拯救夢想

拯救夢想什麼意思?你夢想著拯救人嗎?拯救人們的夢想有一個現實,也有夢想的主觀想像力,請參閱週宮官方網站拯救人民夢想的詳細解釋。夢想著敵人被拯救出來
2022愛方向和生日是在[質量個性]中

2022愛方向和生日是在[質量個性]中

[救生員]有人說,在出生88天之前,胎兒已經知道哪天的出生,如何有優質的個性,將走在什麼樣的愛情之旅,將與生活生活有什么生活。今天
夢想切割剪裁

夢想切割剪裁

夢想切割剪裁什麼意思?你夢想切你的手是好的嗎?夢想切割手工切割手有一個真正的影響和反應,也有夢想的主觀想像力。請參閱官方網站夢想的細節,以削減手
夢想著親人死了

夢想著親人死了

夢想著親人死了什麼意思?你夢想夢想你的親人死嗎?夢想有一個現實的影響和反應,還有夢想的主觀想像力,請參閱夢想世界夢想死亡的親屬的詳細解釋
夢想搶劫

夢想搶劫

夢想搶劫什麼意思?你夢想搶劫嗎?夢想著搶劫有一個現實的影響和反應,也有夢想的主觀想像力,請參閱週恭吉夢官方網站的詳細解釋。夢想搶劫
夢想缺乏缺乏紊亂

夢想缺乏缺乏紊亂

夢想缺乏缺乏紊亂什麼意思?你夢想缺乏異常藥物嗎?夢想缺乏現實世界的影響和現實,還有夢想的主觀想像,請看官方網站的夢想組織缺乏異常藥物。我覺得有些東西缺失了